Municipal Water Supply · Indonesia, Indonesia
Municipal Water Supply Foundation Protection Project - Indonesia, Indonesia
A PVC geomembrane application case with project context and implementation details.

Project overview
Large-scale municipal water supply foundation protection project completed in Indonesia, Indonesia. This project involved installation of 92026 square meters of 0.75mm PVC geomembrane for waterproofing and containment purposes. The project was successfully completed in 6 months with excellent quality standards.
Project background
This municipal water supply project in Indonesia, Indonesia required a reliable waterproofing solution for a foundation protection application. The client needed a high-quality containment system that could withstand local environmental conditions and provide long-term performance.
Implementation
The project was implemented over 6 months, involving site preparation, membrane installation, welding, and comprehensive testing. Our professional team ensured all work met international quality standards.