Project overview
Large-scale reservoir construction mining tailings project completed in Spain, Spain. This project involved installation of 96311 square meters of 0.75mm PVC geomembrane for waterproofing and containment purposes. The project was successfully completed in 11 months with excellent quality standards.
Project background
This reservoir construction project in Spain, Spain required a reliable waterproofing solution for a mining tailings application. The client needed a high-quality containment system that could withstand local environmental conditions and provide long-term performance.
Implementation
The project was implemented over 11 months, involving site preparation, membrane installation, welding, and comprehensive testing. Our professional team ensured all work met international quality standards.