Wastewater Treatment · Saudi Arabia, Saudi Arabia
Wastewater Treatment Landfill Liner Project - Saudi Arabia, Saudi Arabia
A PVC geomembrane application case with project context and implementation details.

Project overview
Large-scale wastewater treatment landfill liner project completed in Saudi Arabia, Saudi Arabia. This project involved installation of 97491 square meters of 1.0mm PVC geomembrane for waterproofing and containment purposes. The project was successfully completed in 6 months with excellent quality standards.
Project background
This wastewater treatment project in Saudi Arabia, Saudi Arabia required a reliable waterproofing solution for a landfill liner application. The client needed a high-quality containment system that could withstand local environmental conditions and provide long-term performance.
Implementation
The project was implemented over 6 months, involving site preparation, membrane installation, welding, and comprehensive testing. Our professional team ensured all work met international quality standards.