Wastewater Treatment · Saudi Arabia, Saudi Arabia
Wastewater Treatment Pond Lining Project - Saudi Arabia, Saudi Arabia
A PVC geomembrane application case with project context and implementation details.
_8acfe6d6.png)
Project overview
Large-scale wastewater treatment pond lining project completed in Saudi Arabia, Saudi Arabia. This project involved installation of 7247 square meters of 0.75mm PVC geomembrane for waterproofing and containment purposes. The project was successfully completed in 10 months with excellent quality standards.
Project background
This wastewater treatment project in Saudi Arabia, Saudi Arabia required a reliable waterproofing solution for a pond lining application. The client needed a high-quality containment system that could withstand local environmental conditions and provide long-term performance.
Implementation
The project was implemented over 10 months, involving site preparation, membrane installation, welding, and comprehensive testing. Our professional team ensured all work met international quality standards.